Project Description
The proposed project will involve the reconditioning of Brownwood Road from Bronson Parkway to the East End cul-de-sac in the City of Fennimore. The project will be approximately 1270 feet (0.24 miles) in length, and the reconditioned roadway width will be 36 feet. The project will consist of pulverizing and resurfacing the existing roadway in place, while keeping the existing curb and gutter in place.
Project Schedule
Design – Summer 2022
Permitting – Fall/Winter 2022
Construction Start – Spring 2023
Construction End – Approximately 60 days after start